The new hut is now installed and the benches and table returned and ready to use , although there is still a second phase to fit a panel fence between the two cabins and to grass the area uncovered by the re-alignment of the new smaller unit, the aim is to fit an extension to the transmitter shelf on one side and to give a wind break to the other (BBQ) area.
The new hut will also be lowered as part of the second phase, the larger cabin has also been subjected to a refit with the store enlarged with new shelving fitted to give us a better storage facility, the addition of a workbench in the area recovered from the removal of the now redundant toilet section will give an emergency repair area out of the wind etc.
The bench area will have containers to hold (1) found items left behind by members and(2) one for surplus items for passing on (freebies) also it would be nice to have some items that could be used for on site repairs so if you are cleaning up the workshop please consider this.
The larger hut will continue to be the primary cabin and will keep the windsock and notice boards although there are first aid kits in both cabins.
Thanks to all who have helped in any way.
